Ryan has nearly finished the weatherboards on the west side and is Dean continuing work on the
east deck covering.
Tuesday 27 February 2018
Stained glass windows
The two sets of french doors linking the hall to the extension, both opening into the dining room, will have stained glass windows.
Through Pete Bassant, who's doing our kitchen joinery, we stumbled upon a great stained glass window maker in Featherston and it turns out he'd repaired the stained glass window next to our front door a few years ago.
So while he waits for the new doors to be built he is making a new round stained glass window for the front door to replace the plain glass that's there at the moment.
Through Pete Bassant, who's doing our kitchen joinery, we stumbled upon a great stained glass window maker in Featherston and it turns out he'd repaired the stained glass window next to our front door a few years ago.
The front door and window |
This is the window on the bottom left being repaired. |
So while he waits for the new doors to be built he is making a new round stained glass window for the front door to replace the plain glass that's there at the moment.
Glass cut and ground and laid out. |
Being leaded up |
Leaded up |
Puttied and drying before being cleaned and the lead blackened. |
Friday 23 February 2018
Thursday 22 February 2018
Another wet one
The rain returned so some internal framing was done - this is the wall between the ensuite and pantry.
And when the rain stopped there was some more progress with the deck covering.
And when the rain stopped there was some more progress with the deck covering.
Wednesday 21 February 2018
Weatherboards on back of extension
Tuesday 20 February 2018
Neither rain, nor snow, nor sleet...
There was a storm forecast so Ryan and Cody worked indoors, first strengthening the existing roof supports and then demolishing the kitchen and the wall between what was the kitchen and laundry.