Friday 26 November 2021

Range in the home

We've restored the Shacklock range and it is now decorates our kitchen.


It is now only a few feet away from where it lived for 100 years. 

The original house was built in 1918 and the range was removed from the old kitchen early in 2018.

 

 


It briefly sat in its new location when the extension was being built.


Tuesday 23 November 2021

Pool landscaping about to start

We marked up where the fence and some path "cutouts" are going to be in advance of the ground being prepared soon.

(The temporary fencing is only big enough to do part of the area. The fence will go all the way to the shed).

 




Tuesday 9 November 2021

Tuesday 2 November 2021

Pool, bedroom and bathroom

Another busy day with the pool tiles (copings) starting to be laid, Shaun helping to install a new Samsung "Frame" TV in the bedroom, and Dean and Scott installing a new attic access ladder in the under-renovation bathroom.



   A Canaletto is better than a big black screen. Just need to add the wood coloured frames when they arrive.

  

New ceiling access point.
                                                       

Tuesday 26 October 2021

Front bedroom wallpapered, shed power completed, and pump and filter installation started

A productive day. We now have power in the pool shed and the installation of the pump, filter and control system has started.

And the front bedroom’s feature wall got wallpapered.










 


Saturday 16 October 2021