The pool was filed for the first time while porous concrete was poured into the ground around it.
Thursday 23 September 2021
Wednesday 22 September 2021
Last rooms being floor sanded.
At the same time as the pool was being lowered into place the last two rooms, the front bedrooms, were having their floors sanded.
Monday 20 September 2021
Pool hole dug
Trees removed, pool hole dug, soak pit made and new power cable for pool shed laid today.
Before and after shots:
From the start of the day:
Wednesday 15 September 2021
The pool has arrived
It's being stored here for a week so that they could make one trip from Tauranga to deliver our pool and the smaller blue one which is someone else's. Pool hole gets dug next week.
Subscribe to:
Posts (Atom)