Thursday 23 September 2021

Pool filled

 The pool was filed for the first time while porous concrete was poured into the ground around it.



New front steps

 Dean and Scott have replaced the old concrete front steps with wooden ones.



Wednesday 22 September 2021

Last rooms being floor sanded.

At the same time as the pool was being lowered into place the last two rooms, the front bedrooms, were having their floors sanded.






Pool dropped into hole

 Pool got put into the hole today. There's a video after the photos.












Monday 20 September 2021

Pool hole dug

Trees removed, pool hole dug, soak pit made and new power cable for pool shed laid today.

Before and after shots: 


 

From the start of the day:















Wednesday 15 September 2021

The pool has arrived

It's being stored here for a week so that they could make one trip from Tauranga to deliver our pool and the smaller blue one which is someone else's. Pool hole gets dug next week.