A productive day. We now have power in the pool shed and the installation of the pump, filter and control system has started.
And the front bedroom’s feature wall got wallpapered.
A productive day. We now have power in the pool shed and the installation of the pump, filter and control system has started.
And the front bedroom’s feature wall got wallpapered.
At the same time as the pool was being lowered into place the last two rooms, the front bedrooms, were having their floors sanded.