Tuesday, 26 October 2021

Front bedroom wallpapered, shed power completed, and pump and filter installation started

A productive day. We now have power in the pool shed and the installation of the pump, filter and control system has started.

And the front bedroom’s feature wall got wallpapered.










 


Saturday, 16 October 2021

Thursday, 23 September 2021

Pool filled

 The pool was filed for the first time while porous concrete was poured into the ground around it.



New front steps

 Dean and Scott have replaced the old concrete front steps with wooden ones.



Wednesday, 22 September 2021

Last rooms being floor sanded.

At the same time as the pool was being lowered into place the last two rooms, the front bedrooms, were having their floors sanded.