Friday, 29 October 2021
Tuesday, 26 October 2021
Front bedroom wallpapered, shed power completed, and pump and filter installation started
A productive day. We now have power in the pool shed and the installation of the pump, filter and control system has started.
And the front bedroom’s feature wall got wallpapered.
Monday, 18 October 2021
Saturday, 16 October 2021
Thursday, 23 September 2021
Wednesday, 22 September 2021
Last rooms being floor sanded.
At the same time as the pool was being lowered into place the last two rooms, the front bedrooms, were having their floors sanded.
Subscribe to:
Posts (Atom)