Hoping the windows will arrive today. Yesterday I picked up another 300 lineal metres of matai flooring boards so this morning Cody and I stacked them, plus the ones I had put in the shed a month ago, inside the extension which is mainly watertight and will be even more so if the windows are put in today.
Dean is working on the roof over the steps up to the verandah from near where the garage will eventually be.
The first four windows have arrived.
Friday, 2 March 2018
Thursday, 1 March 2018
East weatherboards
Ryan put weatherboards on the east wall in anticipation of the windows arriving soon.
And we went to see Peter Allum in Featherston and the stained glass window for the front door.
And we went to see Peter Allum in Featherston and the stained glass window for the front door.
Tuesday, 27 February 2018
East and west
Ryan has nearly finished the weatherboards on the west side and is Dean continuing work on the
east deck covering.
east deck covering.
Stained glass windows
The two sets of french doors linking the hall to the extension, both opening into the dining room, will have stained glass windows.
Through Pete Bassant, who's doing our kitchen joinery, we stumbled upon a great stained glass window maker in Featherston and it turns out he'd repaired the stained glass window next to our front door a few years ago.
So while he waits for the new doors to be built he is making a new round stained glass window for the front door to replace the plain glass that's there at the moment.
Through Pete Bassant, who's doing our kitchen joinery, we stumbled upon a great stained glass window maker in Featherston and it turns out he'd repaired the stained glass window next to our front door a few years ago.
| The front door and window |
| This is the window on the bottom left being repaired. |
So while he waits for the new doors to be built he is making a new round stained glass window for the front door to replace the plain glass that's there at the moment.
| Glass cut and ground and laid out. |
| Being leaded up |
| Leaded up |
| Puttied and drying before being cleaned and the lead blackened. |
Friday, 23 February 2018
Thursday, 22 February 2018
Another wet one
The rain returned so some internal framing was done - this is the wall between the ensuite and pantry.
And when the rain stopped there was some more progress with the deck covering.
And when the rain stopped there was some more progress with the deck covering.
Wednesday, 21 February 2018
Weatherboards on back of extension