Matthew finished the polyurethane sealing of the joinery at Pete's Joinery in Greytown today.
Monday, 16 July 2018
Sunday, 15 July 2018
Painting progress
Finished painting the bulk of the extension today so got to strip off the plastic protection and see the rimu joinery again.
Friday, 13 July 2018
Deck progress and rimu joinery
Matthew has been at the joiners in Greytown putting the first coat of polyurethane on the rimu joinery.
Thursday, 12 July 2018
Wednesday, 4 July 2018
Decking and ceiling
Ryan's doing the decking and Matthew's painting the ceiling.
The water softener was installed today but needs the electricity connected.
And the sun is shining.
The water softener was installed today but needs the electricity connected.
And the sun is shining.
Thursday, 28 June 2018
Wednesday, 27 June 2018